How to manufacture a product in China: a step-by-step guide
In short: manufacturing a product in China has seven stages: define the product and quantity, do the engineering and prototype, find and vet the factory, protect your idea, approve pre-production samples, control quality during production, and handle shipping and customs. The most expensive mistakes almost always happen before production: designs that can't be manufactured, confidentiality agreements that don't hold up in China, and moulds that aren't in your name.
1. Define the product, quantity and deadline
Before talking to any factory, you need three answers in writing: what the product is (function, approximate size, the materials you have in mind, who it's for), how many units you want in the first order, and when you need them in your warehouse.
Quantity decides almost everything. Below a few hundred units it usually makes more sense to customise a product that already exists; if you need your own injection-moulded plastic part, the mould is an investment that only pays off with volume. That's why it helps to know from the start whether you're after a custom product or an existing one with your brand.
2. Engineering and prototype
A factory can't quote an idea: it needs drawings. If you're starting from a sketch, engineering means turning it into a manufacturable design, which the industry calls DFM (design for manufacturing):
- Choosing the manufacturing process: plastic injection moulding, CNC machining, sheet metal, casting, PCBs, textiles…
- Defining materials, tolerances and finishes.
- Preparing the drawings and 3D files (usually STEP) and, for electronics, the schematic, the PCB layout and the bill of materials (BOM).
- Validating with prototypes: 3D printing for shape and ergonomics, CNC or working prototypes to check that it functions.
A prototype that fails isn't a failure: it's the cheap way to discover a problem that would cost thousands in production.
3. Find and vet the factory
China is highly specialised by region. Electronics is concentrated around Shenzhen and Dongguan in the Pearl River Delta; Ningbo and Yuyao in Zhejiang are known for moulds and plastics; Foshan for furniture; Yiwu for small consumer goods. Searching in the right area multiplies your options.
The usual ways to find suppliers are B2B directories (Alibaba for export, 1688 for the domestic Chinese market), trade fairs such as the Canton Fair, held every spring and autumn, and recommendations within your industry. Either way, before you pay anything:
- Check that it's a factory and not a trading company: ask for the business licence and verify that its scope includes making what you need.
- Get several comparable quotes, based on the same drawing and the same quantity.
- Visit the plant or commission an audit: seeing the machines, the quality control and the other products they make tells you more than any catalogue.
4. Protect your idea before showing it
This is the step people skip most, and the one that costs most later.
- An NNN agreement, not just any NDA. An NDA written under your own country's law is hard to enforce in China. The recommended approach is an NNN agreement (non-disclosure, non-use and non-circumvention) written in Chinese, governed by Chinese law and with jurisdiction in the courts where the factory is.
- Register your trademark in China. China grants trademarks to whoever files first, not to whoever uses them. If you don't register yours, someone else can, and block your shipments.
- Mould and designs in your name. If you pay for the mould, the contract must say it's yours and that you can remove it. Without that clause, switching supplier can mean paying for another mould.
5. Pre-production samples
Before mass production, the factory makes samples with the final process, mould and materials. This is the moment to check dimensions, colour, finish, assembly and packaging, and to ask for corrections. Once a sample is right, it's approved in writing and kept signed (the so-called golden sample): it becomes the reference against which the whole production run is inspected.
6. Production and quality control
Quality isn't checked when the goods arrive, once they're paid for and it's too late. It's controlled at the factory:
- Initial inspection of materials and first parts.
- During-production inspection, to catch defects while they can still be fixed.
- Pre-shipment inspection with AQL statistical sampling: a random number of units, based on the lot size, is checked against the approved sample and a defect list agreed in advance.
In practice, tie the final payment to a passed pre-shipment inspection.
7. Shipping, customs and regulations
Incoterms. They define where the factory's responsibility ends. The most common when buying from China are EXW (you collect at the factory), FOB (the factory delivers it loaded at the Chinese port), CIF (the factory pays freight and insurance to the destination port) and DDP (you receive it at destination with customs paid). An FOB price includes neither freight nor import costs: always compare quotes on the same terms.
Transport. Sea freight is the cheapest for volume but takes several weeks port to port; air freight is much faster and more expensive, and is kept for samples, urgent orders or light goods.
Importing into the EU requires:
- An EORI number, which identifies the importer to EU customs.
- Classifying the product with its TARIC code, which sets the duty you pay.
- Paying import VAT at your country's rate.
The UK and the US follow the same logic with their own systems (an EORI or importer number, a tariff classification and their own duties and taxes).
Product regulations. Depending on the product, in the EU it may need CE marking (electronics, toys, machinery…), to comply with RoHS and REACH (hazardous substances) and with the General Product Safety Regulation (GPSR), which requires an EU-based responsible person for consumer products. Find out before you design, not at customs.
What it costs to manufacture in China
The unit price the factory quotes is only part of the cost. To know what each product really costs you in your warehouse, add up:
| Item | When you pay | What it depends on |
|---|---|---|
| Engineering and prototypes | Once, at the start | How developed the idea is and how many iterations are needed |
| Mould and tooling | Once, before production | Part size and complexity, number of cavities, tool life |
| Samples | Before production | Number of correction rounds |
| Unit price | With every order | Material, process, labour and, above all, quantity |
| Quality inspections | With every order | Number of inspections and lot size |
| Freight and insurance | With every order | Volume, weight, Incoterm and sea or air |
| Import duty and VAT | On arrival at customs | Tariff code and value of the goods |
| Certifications | Once per product | Whether it needs CE, lab testing, etc. |
Fixed costs (engineering, mould, certifications) are spread across every unit: that's why the same product can be very expensive at 300 units and highly competitive at 5,000.
Common mistakes when manufacturing in China
- Asking for quotes without drawings. Each factory imagines a different product and the quotes can't be compared.
- Choosing on price alone. The cheapest quote often wins back its margin with worse materials or later surcharges.
- Signing a Western NDA and assuming you're protected.
- Not putting the mould in your name.
- Paying 100% before inspection.
- Discovering product regulations at customs.
Want us to do it for you?
At Anvilon we handle all seven stages: engineering, factory sourcing and visits, production, quality control and shipping. You can start with drawings or just an idea.
Start my project